← Back to the tracker

Central UTA school expansion

In review — NOT approved

In plain words

Central UTA school expansion is a school project in Airmont, at 236 Cherry Lane, Airmont. Still being reviewed. Not approved yet. It would bring School, not housing - new 3-story classroom building, ~33,500 sq ft footprint, adding roughly 1,000 students; site ~21.43 acres; 310 parking spaces (228 constructed + 83 land-banked) vs 619 required. The full record and full history are below.

Address: 236 Cherry Lane, Airmont
Jurisdiction: Village of Airmont (not mailing address)
Town: Airmont

Status: ZBA variances approved 5-0; final site plan NOT verified
Status date: ZBA variances approved 5-0; Planning Board reaffirmed prior SEQRA Negative Declaration early 2025; ARC 2025-05-20 pressed for photo-based visibility visuals

Plans, designs and renderings

No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.

Full record

Units: School, not housing - new 3-story classroom building, ~33,500 sq ft footprint, adding roughly 1,000 students; site ~21.43 acres; 310 parking spaces (228 constructed + 83 land-banked) vs 619 required

Stories / height: Not verified

Site: ~21.43 acres, ~500 ft south of East Blossom Road; front setback ~75.8 ft

Parking: 310 spaces (228 constructed + 83 land-banked) vs 619 required

Applicant / engineer: Not stated in sources checked

Plan set: See Airmont ZBA page and Citizen Portal summaries

Plan / packet (public source) Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

Updated

Updated at: 2026-10-30

← Back to the tracker

Words used on this page