Airmont schools and congregations roundup
Roundup — mixed
In plain words
Airmont schools and congregations roundup is a group of smaller projects in Airmont, at 236 Cherry Lane; 51 Church Rd; 267 Cherry Lane; 454 Saddle River Rd; 2 Hillside Ave; 83 Campbell Ave. A mix of smaller projects. See the full record below for each one. The plan covers Schools, not housing. The full record and full history are below.
Address: 236 Cherry Lane; 51 Church Rd; 267 Cherry Lane; 454 Saddle River Rd; 2 Hillside Ave; 83 Campbell Ave
Jurisdiction: Village of Airmont (verify each by tax map) (not mailing address)
Town: Airmont
Status: Mixed - see notes
Status date: Central UTA ZBA variances 5-0, final site plan not verified; Nobina special permit + final site plan approved 2025-10-28; 267 Cherry Lane in review Apr 2026; 454 Saddle River + 2 Hillside approved Jan 2025; Torah Sefer variances 5-0, final site plan unverified
Plans, designs and renderings
No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.
Full record
Units: Schools, not housing
Stories / height: Central UTA 3-story classroom building
Site: See packet for each site
Parking: See packet
Applicant / engineer: See packet
Plan set: See Airmont raw report
Gaps: Final site plan verifications.
Next check: Final site plans for Central UTA and Torah Sefer
Blogable: Nobina + Central UTA as a pair, yes
Infrastructure, paths and parks
Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.
- Drainage / stormwater: Nobina: drainage beneath the rear play area (site plan as presented)
- Drainage / stormwater: Torah Sefer: underground stormwater detention reviewed by the village engineer
- Sidewalks: Central UTA: county-required sidewalk, discussed at ARC 2025-05-20 (applicant expected it on the opposite side of the road due to slope/utility poles)
- Parks / open space: Nobina: rear play area + proposed fenced tennis court (site plan as presented)
History — old statuses are kept, never overwritten
- 2026-10-26 — CMS snapshot: Central UTA variances 5-0 final site plan not verified; Nobina approved 2025-10-28; 267 Cherry Lane in review Apr 2026; 454 Saddle River + 2 Hillside approved Jan 2025; Torah Sefer variances 5-0 final unverified (Mixed) source
Words used on this page
- ZBA: ZBA is the zoning appeals board. It decides requests to vary from the zoning rules.