← Back to the tracker

Chair Factory

Approved

In plain words

Chair Factory is a housing project in Haverstraw, at 30 Liberty St, Haverstraw waterfront. Approved. Building has not started yet. It would bring ~450 homes, 68% income-restricted per ESD memo (300+ income-restricted; application said over 60% at 30-130% AMI). The full record and full history are below.

Address: 30 Liberty St, Haverstraw waterfront
Jurisdiction: Village of Haverstraw (not mailing address)
Town: Haverstraw

Status: Site plan + preliminary subdivision approved; not under construction
Status date: 2026-09 (Momentum Fund award reported); PILOT supported 2026-02-02; MDA 6th amendment 2026-06-29

Plans, designs and renderings

Images from the proposal itself, not stock photos. Captions give the source document and sheet.

Chair Factory waterfront trail rendering from the Haverstraw DRI plan
Chair Factory waterfront trail rendering from the Haverstraw DRI plan. Rendering, not a dimensioned plan sheet. Source: Haverstraw DRI Strategic Investment Plan, p.94 (rendering).
Haverstraw DRI area map (area-wide context, includes the Chair Factory and Village Square area)
Haverstraw DRI area map (area-wide context, includes the Chair Factory and Village Square area). Area map, not a project-specific plan. Source: Haverstraw DRI Strategic Investment Plan, p.10 (area map).
Chair Factory site plan diagram, Exhibit A: Lots 1-3 residential parcels, Lot 5 hotel parcel (latter phase), Lot 6 parkland
Chair Factory site plan diagram, Exhibit A: Lots 1-3 residential parcels, Lot 5 hotel parcel (latter phase), Lot 6 parkland. Diagrammatic only, NOT dimensioned: no heights, stories, elevations, dimensions, setbacks, lot areas, parking layouts, or road names. Gives lot/footprint positions only. Source: ESD Board Meeting Materials, 2026-02-19, master p.211, Dattner Architects, Project 2415, Dwg EX. A, scale 1" = 200', dated 02/02/2026, marked DRAFT.
Chair Factory waterfront rendering: multi-building residential development on the Hudson peninsula
Chair Factory waterfront rendering: multi-building residential development on the Hudson peninsula. Rendering, not a dimensioned plan sheet. Source: Governor's office, Mid-Hudson Momentum Fund awards announcement, September 2026 (image file HaverstrawChairFactoryProject.jpg).

Full record

Units: ~450 homes, 68% income-restricted per ESD memo (300+ income-restricted; application said over 60% at 30-130% AMI)

Stories / height: Overlay: 5 stories / 65 ft (Standard 1), 6 stories / 85 ft (Standard 2), street-wall + 7-ft stepback

Site: ~19.61 acres, former Empire Chair site, vacant since early-2000s demolition, partly Brownfield Cleanup

Parking: ~503-574 depending on version

Applicant / engineer: The Haverstraw Community Chair Factory LLC; site plan diagram by Dattner Architects, Project 2415, Dwg EX. A, DRAFT, 02/02/2026, 1in=200ft

Plan set: ESD Exhibit A is diagrammatic only: Lots 1-3 residential footprints, Lot 4 village corridor, Lot 5 hotel (latter phase, surface parking meantime), Lot 6 village parkland. No heights, dimensions, setbacks, parking layout, or labelled trail on that sheet.

Gaps: Building-by-building footprints/elevations from Village site plan / GPP appendices still needed for full 3D model.

Next check: Construction start; Village site-plan elevations (not ESD diagram)

Blogable: YES - lead

Plan / packet (public source) Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

History — old statuses are kept, never overwritten

← Back to the tracker

Words used on this page