← Back to the tracker

HISTORICAL: 125 South Greenbush Site Plan

Historical

In plain words

HISTORICAL: 125 South Greenbush Site Plan is a housing project in Orangetown, at 125 South Greenbush Road. HISTORICAL project — this is a past-year record, not a currently active project. Last known status is below. It would bring Scale unstated in the summary record; separate plan set from 155 South Greenbush. The full record and full history are below.

Address: 125 South Greenbush Road
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangetown

Status: HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known
Status date: Continuation, SEQRA Positive Declaration, PB #19-17, May 22, 2024

Full record

Units: Scale unstated in the summary record; separate plan set from 155 South Greenbush

Stories / height: Not verified

Site:

Parking: Not verified

Applicant / engineer: Not stated in sources checked

Plan set:

Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

No infrastructure item is verified in this project's record yet.

History — how this project changed over time

Updated at: 2024-05-22. Click any date to expand what happened then, and what status the project was left in at that point. Oldest first, so you can read the story down the page.

  1. HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Orangetown PB (Feb 22, 2023 decisions): 125 South Greenbush, PB #19-17 — Postponed. Pre-history to the May 22, 2024 continuation (PB #19-17).

    Status at this point: HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Board record →

  2. HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Orangetown PB (Mar 22, 2023 decisions): 125 South Greenbush, PB #19-17 — Continued: Retain AKRF as Planner. Pre-history to the May 22, 2024 continuation (PB #19-17).

    Status at this point: HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Board record →

  3. HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Orangetown PB (May 22, 2024 decisions): 125 South Greenbush, PB #19-17 — Continuation, SEQRA Positive Declaration. Separate plan set from 155 South Greenbush (PB #19-18).

    Status at this point: HISTORICAL - Continuation, SEQRA Positive Declaration, Planning Board, May 22, 2024 - last known

    Board record →

← Back to the tracker

Words used on this page