HISTORICAL: 897 Route 9W Site Plan
Historical
In plain words
HISTORICAL: 897 Route 9W Site Plan is a housing project in Orangetown, at 897 Route 9W. HISTORICAL project — this is a past-year record, not a currently active project. Last known status is below. It would bring Scale unstated in the summary record. The full record and full history are below.
Address: 897 Route 9W
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangetown
Status: HISTORICAL - Final Approval + Negative Declaration, Planning Board, January 10, 2024 - last known
Status date: Final Approval + Negative Declaration, PB #24-04, January 10, 2024 (6 aye)
Full record
Units: Scale unstated in the summary record
Stories / height: Not verified
Site:
Parking: Not verified
Applicant / engineer: Not stated in sources checked
Plan set:
Infrastructure, paths and parks
Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.
No infrastructure item is verified in this project's record yet.
History — how this project changed over time
Updated at: 2024-01-10. Click any date to expand what happened then, and what status the project was left in at that point. Oldest first, so you can read the story down the page.
HISTORICAL - Final Approval + Negative Declaration, Planning Board, January 10, 2024 - last known
Orangetown PB (Jul 26, 2023 decisions): 897 Route 9W, PB #23-36 — Preliminary Subject to Conditions + Negative Declaration. PB number differs from the January 10, 2024 Final Approval (PB #24-04) at the same address — recorded here as an earlier stage on address + application match, PB difference flagged, not smoothed.
Status at this point: HISTORICAL - Final Approval + Negative Declaration, Planning Board, January 10, 2024 - last known
HISTORICAL - Final Approval + Negative Declaration, Planning Board, January 10, 2024 - last known
Orangetown PB (Jan 10, 2024 decisions): 897 Route 9W, PB #24-04 — Final Approval + Negative Declaration, 6 aye.
Status at this point: HISTORICAL - Final Approval + Negative Declaration, Planning Board, January 10, 2024 - last known
Words used on this page
- Negative Declaration: A Negative Declaration means the board found the project would have no significant impact on the environment.