HISTORICAL: Databank Orangeburg Phase Two, Orangeburg
Historical
In plain words
HISTORICAL: Databank Orangeburg Phase Two, Orangeburg is a housing project in Orangeburg, at 2000 Corporate Drive, Orangeburg. HISTORICAL project — this is a past-year record, not a currently active project. Last known status is below. It would bring Not housing - data center, Phase Two. Scale UNSTATED in the board record read.. The full record and full history are below.
Address: 2000 Corporate Drive, Orangeburg
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangeburg
Status: HISTORICAL - Adopt Scoping Document, Planning Board, September 23, 2026 - last known
Status date: SEQRA Positive Declaration Jul 8, 2026; Draft EIS Scoping Document discussed Aug 26, 2026; AKRF directed to revise the scoping document Sep 9, 2026; scoping document adopted Sep 23, 2026. Continuation of the 2025 draft (continued Jan 8, Jul 23, Oct 22, 2025). NOT approved on this record.
Full record
Units: Not housing - data center, Phase Two. Scale UNSTATED in the board record read.
Stories / height: Not verified
Site: Orangeburg, PB #25-02
Parking: Not verified
Applicant / engineer: Not stated in sources checked
Plan set: Draft EIS scoping (SEQRA) - no site plan approval in this record
Infrastructure, paths and parks
Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.
No infrastructure item is verified in this project's record yet.
History — how this project changed over time
Updated at: 2026-09-23. Click any date to expand what happened then, and what status the project was left in at that point. Oldest first, so you can read the story down the page.
HISTORICAL - Adopt Scoping Document, Planning Board, September 23, 2026 - last known
Orangetown Planning Board (Sep 23, 2026): Databank Orangeburg Phase Two, 2000 Corporate Dr, PB #25-02 - Adopt Scoping Document. Earlier 2026: Continued for Revised Plans and more information (Mar 25); POSTPONED BY APPLICANT TO JULY 8, 2026 (May 27); Continuation, SEQRA Positive Declaration (Jul 8); Discussion of the Draft EIS Scoping Document (Aug 26); AKRF directed to revise the scoping document (Sep 9). Scale unstated. NOT approved on this record; scoping only.
Status at this point: HISTORICAL - Adopt Scoping Document, Planning Board, September 23, 2026 - last known
Words used on this page
- SEQRA: SEQRA is the state environmental review law. A project goes through this review before a board can approve it.
- PLI: PLI is Planned Light Industrial zoning, for light industrial uses such as warehouses and offices.