Vitz / Bais Yehuda school building
In review — NOT approved
In plain words
Vitz / Bais Yehuda school building is a school project in New Hempstead, at 710 Union Road, New Hempstead, Ramapo Tax Map 42.17-1-95, 1R-40 (special use permit for school already granted). Still being reviewed. Not approved yet. The plan covers School, not housing - standalone 11,830 sq ft two-story school building, as an addition to the existing two-story school building. The full record and full history are below.
Address: 710 Union Road, New Hempstead, Ramapo Tax Map 42.17-1-95, 1R-40 (special use permit for school already granted)
Jurisdiction: Village of New Hempstead (not mailing address)
Town: New Hempstead
Status: In review - NOT approved
Status date: Planning Board declared intent to be lead agency 2025-02-03 (SEQRA, unlisted action; notice dated 2025-02-03, file posted Feb 2026); no approval found
Plans, designs and renderings
No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.
Full record
Units: School, not housing - standalone 11,830 sq ft two-story school building, as an addition to the existing two-story school building
Stories / height: Not verified
Site: Not stated in sources checked
Parking: Not verified
Applicant / engineer: Yehoshua Hershko / Vitz-Bais Yehuda, Inc.
Plan set: Site plan approval sought for standalone school building (lead-agency intent only in sources checked)
Gaps: Approval after lead-agency intent
Next check: Planning Board decision after Feb 2025 lead-agency intent
Blogable: NO
Infrastructure, paths and parks
Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.
No infrastructure item is verified in this project's record yet.
History — old statuses are kept, never overwritten
- 2025-02-03 — Planning Board declared intent to be lead agency (SEQRA, unlisted action) for 11,830 sq ft two-story school building - no approval (In review - NOT approved) source
Words used on this page
- SEQRA: SEQRA is the state environmental review law. A project goes through this review before a board can approve it.