← Back to the tracker

155 South Greenbush Road Multifamily Community

In review — NOT approved

In plain words

155 South Greenbush Road Multifamily Community is a housing project in Orangetown, at 155 South Greenbush Road, Orangeburg, Tax Lot 74.07-1-15.2 (petition also cites 74.07 in one agenda item - flagged, not smoothed). Still being reviewed. Not approved yet. It would bring 180 dwellings derived (160 apartment units: 96 one-bed, 64 two-bed, ~172,000 sq ft across two buildings with roof decks + 20 townhouses: 2.5-story, 2-3 bed,…. The full record and full history are below.

Address: 155 South Greenbush Road, Orangeburg, Tax Lot 74.07-1-15.2 (petition also cites 74.07 in one agenda item - flagged, not smoothed)
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangetown

Status: In review - rezoning petition, NOT approved
Status date: Town Board SEQRA lead-agency intent resolution 2025-09-30 (Type I action); public hearing on local law postponed 2025-11-18 to 2025-12-16, again to 2026-01-20 at applicant request; adoption after Jan 2026 unverified

Plans, designs and renderings

No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.

Full record

Units: 180 dwellings derived (160 apartment units: 96 one-bed, 64 two-bed, ~172,000 sq ft across two buildings with roof decks + 20 townhouses: 2.5-story, 2-3 bed, ~2,400 sq ft each) + 8,000 sq ft clubhouse - concept plan, NOT approved

Stories / height: Not verified

Site: Petition for a Multifamily Dwelling Community floating zone in the LI district

Parking: Not verified

Applicant / engineer: 125 Greenbush LLC, related company of Alexander Property Holdings LLC; engineer Stonefield Engineering, Project NYC-240245; architecture Meyer Design (Feb 2025 presentation)

Plan set: Concept plan, Feb 2025 presentation (Stonefield); petition 2025-09-22

Gaps: Whether the local law was ever adopted after Jan 2026 is NOT verified; County GML review 2025-11-12 (GML-25-0521) was for the local law only - zoning-map amendment and site plan were not then under review

Next check: Local-law adoption after Jan 2026; zoning-map amendment and site-plan review if adopted

Blogable: YES

Plan / packet (public source) Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

No infrastructure item is verified in this project's record yet.

History — old statuses are kept, never overwritten

← Back to the tracker

Words used on this page