Palisades Renewal Center (former IBM/HNA site)
In review — NOT approved
In plain words
Palisades Renewal Center (former IBM/HNA site) is a housing project in Orangetown, at Former IBM/HNA Palisades Conference Center site, Tax Lot 78.13-1-1, Palisades area (abuts Palisades Interstate Parkway, NYS Route 340, US Route 9W). Still being reviewed. Not approved yet. It would bring 342 townhouse-style units (modified proposal, June 2026; no more than 342), plus event venue / redesigned amenities center. The full record and full history are below.
Address: Former IBM/HNA Palisades Conference Center site, Tax Lot 78.13-1-1, Palisades area (abuts Palisades Interstate Parkway, NYS Route 340, US Route 9W)
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangetown
Status: In review - NOT approved
Status date: Town Board presentation 2026-06-23, informational only, no zoning vote; applicant said no zone-change petition had been filed
Plans, designs and renderings
No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.
Full record
Units: 342 townhouse-style units (modified proposal, June 2026; no more than 342), plus event venue / redesigned amenities center; hotel facility if circumstances warrant
Stories / height: Not verified
Site: Existing site: 206-room hotel + ~450,000 sq ft conference complex (late 1970s/early 1980s, IBM); demolition of existing conference center proposed
Parking: Not verified
Applicant / engineer: Palisades Renewal Center LLC (a/k/a REVEIL), in joint venture with Atlantic as Orangetown Palisades Renewal Center JV Company, LLC
Plan set: No site plan, unit mix, height, parking, or infrastructure figures found in sources checked
Gaps: Zone-change petition / SEQRA filing not yet filed at time of June 2026 presentation; no site plan, unit mix, height, or parking figures
Next check: Zone-change petition / SEQRA filing when submitted; Town Board action after June 2026 presentation
Blogable: YES
Infrastructure, paths and parks
Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.
No infrastructure item is verified in this project's record yet.
History — old statuses are kept, never overwritten
- 2026-06-23 — Town Board presentation, informational only, no zoning vote; modified plan of no more than 342 townhouse-style units; applicant said no zone-change petition had been filed (In review - NOT approved) source
Words used on this page
- SEQRA: SEQRA is the state environmental review law. A project goes through this review before a board can approve it.