← Back to the tracker

The Reserve at Pearl River

Approved — completed / built

In plain words

The Reserve at Pearl River is a housing project in Orangetown, at 555 Veterans Memorial Drive (also listed as 1000 Lucy Ct), Pearl River, Tax Lot 73.10-1-6, OP/PAC district. Built and finished. It would bring 110 senior (55+) rental units. The full record and full history are below.

Address: 555 Veterans Memorial Drive (also listed as 1000 Lucy Ct), Pearl River, Tax Lot 73.10-1-6, OP/PAC district
Jurisdiction: Town of Orangetown (not mailing address)
Town: Orangetown

Status: Approved with conditions - site plan approved; completed / built 2025
Status date: Performance bond $1,330,004.50 accepted/filed by Town Board Res. 2023-354; bond released 2026-06-23 on Planning Board recommendation (PB #26-26); rental listings show built 2025, units available

Plans, designs and renderings

No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.

Full record

Units: 110 senior (55+) rental units

Stories / height: 3 stories

Site: OP/PAC district; ZBA variances sought 2022 for height/side yard and for 110 units vs 85 permitted (ZBA #22-33)

Parking: Not verified

Applicant / engineer: The Reserve at Pearl River LLC

Plan set: Site plan approved (bond released June 2026, consistent with public improvements complete)

Gaps: None outstanding - completed project, now leasing

Next check: None - completed

Blogable: YES

Plan / packet (public source) Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

No infrastructure item is verified in this project's record yet.

History — old statuses are kept, never overwritten

← Back to the tracker

Words used on this page