Pomona other pipeline roundup

Roundup — mixed

In plain words

Pomona other pipeline roundup is a group of smaller projects in Pomona, at 130 Camp Hill Rd; 8 Ladentown Rd; 60 Halley Dr; 83 Halley Dr. A mix of smaller projects. See the full record below for each one. The plan covers Houses of worship / infrastructure, not housing. The full record and full history are below.

Address: 130 Camp Hill Rd; 8 Ladentown Rd; 60 Halley Dr; 83 Halley Dr
Jurisdiction: Village of Pomona (not mailing address)
Town: Pomona

Status: Mixed
Status date: Bais Levi Yitzchok approved 2023-07-24 (7,845 SF addition, total 9,447 SF + 484 SF mikvah, escrow still open 2025-26); Sri Ranganatha Temple ZBA interpretation dispute 2025, outcome after Oct 2025 not found; Pomona Heights 9,122 SF, extension fee waived June 2024; Veolia tank 2M-gallon, special permit Dec 2023, site plan Feb 2024

Plans, designs and renderings

No usable public plan, rendering, or site-plan image is on file for this project yet. A plan set that is SharePoint-only still needs a live-browser pass, and a project with no public plan at all is not given a borrowed image.

Full record

Units: Houses of worship / infrastructure, not housing

Stories / height: See packet

Site: See packet

Parking: See packet

Applicant / engineer: See packet

Plan set: See Pomona raw report

Gaps: See packet.

Next check: Sri Ranganatha outcome after Oct 2025

Blogable: Roundup only

Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

History — old statuses are kept, never overwritten

← Back to the tracker

Words used on this page