← Back to the tracker

Monsey Luxury Living Subdivision, Spring Valley

Approved

In plain words

Monsey Luxury Living Subdivision, Spring Valley is a housing project in Ramapo, at 133 Route 59, Spring Valley. Approved. It would bring 20 dwellings derived (10 lots, each two-family); existing school to be demolished; private road off Glen Hill Road. The full record and full history are below.

Address: 133 Route 59, Spring Valley
Jurisdiction: Town of Ramapo (not mailing address)
Town: Ramapo

Status: APPROVED — Final Subdivision (Major/Realty) granted, February 10, 2026
Status date: Final Subdivision (Major/Realty) granted 6-0-0, Planning Board minutes, February 10, 2026 (adopted February 24, 2026)

Full record

Units: 20 dwellings derived (10 lots, each two-family); existing classroom building to be demolished; private road off Glen Hill Road

Stories / height: Not verified

Site: 10 lots, private road off Glen Hill Road

Parking: Not verified

Applicant / engineer: Not stated in sources checked

Plan set: Final Subdivision (Major/Realty), February 10, 2026

Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

No infrastructure item is verified in this project's record yet.

History — how this project changed over time

Updated at: 2026-08-17. Click any date to expand what happened then, and what status the project was left in at that point. Oldest first, so you can read the story down the page.

  1. APPROVED — Final Subdivision (Major/Realty) granted, February 10, 2026

    Ramapo PB (Feb 10, 2026 minutes, 8pp, adopted Feb 24, 2026): Monsey Luxury Living, 2024.051, 133 Route 59 — Final Subdivision (Major/Realty) granted 6-0-0; 10 lots, each two-family, existing school to be demolished, private road off Glen Hill Road. 20 dwellings derived from the lot breakdown. No conditions stated in the minutes pass.

    Status at this point: APPROVED — Final Subdivision (Major/Realty) granted, February 10, 2026

    Board record →

  2. APPROVED — Final Subdivision (Major/Realty) granted, February 10, 2026

    Ramapo PB (Aug 17, 2026 minutes, prior pass): Monsey Luxury Living — 1st 90-day extension. Consistent with a February final, extension later; extension details from the prior pass, not re-read here.

    Status at this point: APPROVED — Final Subdivision (Major/Realty) granted, February 10, 2026

    Board record →

← Back to the tracker