← Back to the tracker

Village Square

Under construction

In plain words

Village Square is a housing project in Haverstraw, at 49 W. Broad St. Building has started. It would bring 61 homes (1- to 3-bed) per groundbreaking. The full record and full history are below.

Address: 49 W. Broad St
Jurisdiction: Village of Haverstraw (not mailing address)
Town: Haverstraw

Status: Broke ground; occupancy expected 2028
Status date: Groundbreaking 2026-10-07

Plans, designs and renderings

Images from the proposal itself, not stock photos. Captions give the source document and sheet.

Village Square, 49 W. Broad St: current vs. proposed rendering from the DRI plan
Village Square, 49 W. Broad St: current vs. proposed rendering from the DRI plan. Rendering, not a dimensioned plan sheet. Source: Haverstraw DRI Strategic Investment Plan, p.140 (rendering).
Haverstraw DRI area map (area-wide context, includes the Chair Factory and Village Square area)
Haverstraw DRI area map (area-wide context, includes the Chair Factory and Village Square area). Area map, not a project-specific plan. Source: Haverstraw DRI Strategic Investment Plan, p.10 (area map).

Full record

Units: 61 homes (1- to 3-bed) per groundbreaking; MDP 2022 approved 55 units + 1 superintendent unit - amended site plan / extension for 61-unit version NOT confirmed

Stories / height: 5 stories / 60 ft per MDP 2022; 5th story set back further than 4th

Site: 56,000 sq ft property per DRI; downtown lot

Parking: MDP: 49 on-site + ~61 municipal-lot spaces

Applicant / engineer: Village Square at Haverstraw LLC; MDP drawing 'Preliminary Final Major Site Plan' rev. 28 Feb 2022; Colliers Offsite Exhibit and AB Design elevations (23 Nov 2021) required as exhibits but NOT in minutes PDF

Plan set: DRI current-vs-proposed rendering (DRI p.140) in hand. No standalone final site-plan/elevation PDF found.

Gaps: Colliers Offsite Exhibit, AB Design elevations/floor plans, current-version site plan.

Next check: Confirm amended site plan / extension covering 61 units vs 2022 MDP 55 units; MDP required site plan by 2023-04-01 and construction start within 18 months after site-plan approval unless extended, or parcel reverts to PO zoning

Blogable: YES

Plan / packet (public source) Public source

Infrastructure, paths and parks

Verified items only, from this project's plan set, conditions, or board record. A category with nothing listed here means nothing verified yet, not that the project has none.

History — old statuses are kept, never overwritten

← Back to the tracker