Chair Factory
Approved
Chair Factory is a housing project in Haverstraw. Approved. Building has not started yet.
Address: 30 Liberty St, Haverstraw waterfront
Size: ~450 homes, 68% income-restricted per ESD memo (300+ income-restricted; application said over 60% at 30-130% AMI)
Status: Site plan + preliminary subdivision approved; not under construction
Next step: Construction start
View full project page →
30 West
Under construction
30 West is a housing project in Haverstraw. Building is under way.
Address: 30 West St (also 25 Fairmont Ave, 28 West St)
Size: 81 rentals per later reports; INITIAL site plan (2024) says 82 proposed - discrepancy unresolved, do not pick one without architectural set
Status: Under construction
Next step: Aufgang architectural plans to reconcile 5 vs 6 stories and 81 vs 82 units
View full project page →
Village Square
Under construction
Village Square is a housing project in Haverstraw. Building has started.
Address: 49 W. Broad St
Size: 61 homes (1- to 3-bed) per groundbreaking; MDP 2022 approved 55 units + 1 superintendent unit - amended site plan / extension for 61-unit version NOT confirmed
Status: Broke ground; occupancy expected 2028
Next step: Confirm amended site plan / extension covering 61 units vs 2022 MDP 55 units
View full project page →
Letchworth / BNE
In review — NOT approved
Letchworth / BNE is a housing project in Haverstraw. Still being reviewed. Not approved yet.
Address: Letchworth Village Rd, east side of Tax Lot 19.16-1-14 (154.6 acres)
Size: 300 rentals stated + 1 model unit = 301 by per-building breakdown (53 one-bed, 248 two-bed)
Status: In review - NOT approved
Next step: Rezoning vote
View full project page →
Broadway North PUD
In review — NOT approved
Broadway North PUD is a housing project in Haverstraw. The special zoning area was created, but the site plan itself has not been approved.
Address: 152 Broadway
Size: Not stated in minutes - do NOT invent a total. Minutes state density 25 units per gross lot area, 340 building spaces stated.
Status: Overlay enacted; site-plan approval NOT found
Next step: Village Board minutes 2025-11-17 (L.L. 6-2025 adoption) and any later site-plan hearings
View full project page →
Millers Pond PUD - Phase 2
In review — NOT approved
Millers Pond PUD - Phase 2 is a housing project in Ramapo. The board heard it but has not decided yet.
Address: 110-118 Pomona Rd, Pomona
Size: Phase 2: 355 (97 apartments in Building 2, 256 townhomes, 2 community buildings with 1 residence each). Whole project: 637 homes + ~67,000 sq ft commercial (earlier summaries); Building 2 non-residential ~30,000 sq ft per Aug 2026 minutes item
Status: NOT decided on public record as of 2026-10-26
Next step: Ramapo Planning Board 2026-10-27 meeting and later minutes
View full project page →
Carlton Road PUD
In review — NOT approved
Carlton Road PUD is a development project in Ramapo. Still in environmental review. Not approved yet.
Address: 70 W. Carlton Rd + 109-111 College Rd (plan address shown as 109-111 College Rd; 70 W. Carlton does not appear on C-300)
Size: 562 (110 one-bed, 266 two-bed, 106 three-bed, 80 four-bed)
Status: Proposed - NOT approved, in EIS
Next step: DEIS, after scoping
View full project page →
Herrick Estates
Approved with conditions
Herrick Estates is a housing project in Ramapo. Approved, with conditions to meet.
Address: 37-57 Herrick Ave, 1,2,11,12,21,22,31,32,41,42,51,52 Herrick Parkway, 19,21,23,25 Stephens Place, 14 Morris Ct, Monsey
Size: 166 homes in 14 buildings
Status: APPROVED WITH CONDITIONS - Site Development Permit granted
Next step: Final-map endorsement / fees
View full project page →
Bais Rochel / Congregation Beth Rochel of Monsey
Approved with conditions
Bais Rochel / Congregation Beth Rochel of Monsey is a school project in Ramapo. Approved, with conditions to meet.
Address: 145 Saddle River Rd (school at 175 Saddle River Rd)
Size: School, not housing. Enrollment future: 1,600 Mon-Thu, 800 Fri, 800 Sun (per Aug 2026 resolutions)
Status: APPROVED WITH CONDITIONS - Special Use Permit + Site Development Permit granted
Next step: ZBA 26-359 minutes/agenda (19 Jan 2026) to confirm variances
View full project page →
174-180 Saddle River Road Subdivision
Approved with conditions
174-180 Saddle River Road Subdivision is a housing project in Ramapo. Approved, with conditions to meet.
Address: 174, 176, 178, 180 Saddle River Rd, Monsey, NY 10952
Size: 8 lots, each 2-family + 1 accessory apartment = 24 dwellings derived (not a filed total)
Status: APPROVED WITH CONDITIONS
Next step: Whether Feb conditions satisfied / final map endorsed/filed
View full project page →
Blue Rill Senior Estates
Approved
Blue Rill Senior Estates is a housing project in Airmont. Approved.
Address: 444 Saddle River Rd
Size: 105 senior homes (55+), semi-attached, 2 stories, ~1,292 SF footprint / ~2,000 SF each, 2 community buildings
Status: Site plan approved (headline-level; vote tally not verified)
Next step: Construction start
View full project page →
Chabad of the Heights
In review — NOT approved
Chabad of the Heights is a house of worship project in Pomona. Still being reviewed. Not approved yet.
Address: 34 N. Ridge Rd
Size: House of worship, not housing
Status: In review - NO final approval in May 2026 packet
Next step: Final special-permit / SEQRA / site-plan approval after May 2026
View full project page →
Tartikov / Congregation Rabbinical Institute of Tartikov
In litigation — NOT approved
Tartikov / Congregation Rabbinical Institute of Tartikov is a housing project in Pomona. In court. Not under construction.
Address: 65-67 Route 306
Size: Proposed: up to 255 students + 255 student/family housing units
Status: NOT approved - in federal litigation
Next step: Pomona Board Oct-Nov 2023 packets + ZBA 2024 page live
View full project page →
Airmont schools and congregations roundup
Roundup — mixed
Airmont schools and congregations roundup is a group of smaller projects in Airmont. A mix of smaller projects. See the project page for each one.
Address: 236 Cherry Lane; 51 Church Rd; 267 Cherry Lane; 454 Saddle River Rd; 2 Hillside Ave; 83 Campbell Ave
Size: Schools, not housing
Status: Mixed - see notes
Next step: Final site plans for Central UTA and Torah Sefer
View full project page →
Ramapo schools pipeline roundup
Roundup — mixed
Ramapo schools pipeline roundup is a group of smaller projects in Ramapo. A mix of smaller projects. See the project page for each one.
Address: 61 College Rd / 65-67 Highview Rd; 93-97 Highview Rd; 667 New Hempstead Rd; 297 Spook Rock Rd; 613 Route 306
Size: Schools, not housing
Status: Mixed - see packet
Next step: Ramapo school hearings 2026-10-13 (unconfirmed outcomes)
View full project page →
Pomona other pipeline roundup
Roundup — mixed
Pomona other pipeline roundup is a group of smaller projects in Pomona. A mix of smaller projects. See the project page for each one.
Address: 130 Camp Hill Rd; 8 Ladentown Rd; 60 Halley Dr; 83 Halley Dr
Size: Houses of worship / infrastructure, not housing
Status: Mixed
Next step: Sri Ranganatha outcome after Oct 2025
View full project page →
Haverstraw smaller items roundup
Roundup — mixed
Haverstraw smaller items roundup is a group of smaller projects in Haverstraw. A mix of smaller projects. See the project page for each one.
Address: 63 Maple Ave; 55 Maple Ave; 3 W. Ramapo Rd; Admirals Cove; 16 Dowd St
Size: See packet
Status: Mixed / context
Next step: 63 Maple 2025-26 update
View full project page →
21 Locust Street Subdivision
In review — NOT approved
21 Locust Street Subdivision is a housing project in Ramapo. Still being reviewed. Not approved yet.
Address: 19 & 21 Locust St (agenda item also lists 15 & 21 Locust St and 40 & 44A Hempstead Rd - address discrepancy, do NOT smooth)
Size: 10 lots, 2-family each lot = 20 dwellings derived (not a filed total)
Status: In review - public hearing, NOT approved
Next step: Ramapo PB Oct 27 public hearing outcome
View full project page →
104 Highview Road School
In review — NOT approved
104 Highview Road School is a school project in Ramapo. Only an early idea so far. No hearing, no decision.
Address: 100 & 104 Highview Rd
Size: School, not housing
Status: Concept only - NO action, NO public hearing, NOT approved
Next step: Whether it advances past concept to a formal application
View full project page →
Harriman Meadows (Patrick Farm)
In review — NOT approved
Harriman Meadows (Patrick Farm) is a housing project in Ramapo. Still in environmental review. Not approved yet.
Address: US Route 202 (Haverstraw Road) and NYS Route 306, Pomona, NY 10970
Size: 479 dwellings: 85 single-family, 298 townhouses, 72 condominium flats with affordability provisions, 24 rentals
Status: In EIS review - NOT approved
Next step: Ramapo Town Board / SEQRA index for DEIS
View full project page →
Minisceongo Park
In litigation — NOT approved
Minisceongo Park is a housing project in Ramapo. In court. Not under construction.
Address: 1618 Route 202 (also listed as 1620 Route 202), Pomona, NY 10970 - north side of Route 202, just west of Palisades Interstate Parkway
Size: Program by version - DO NOT merge: original DEIS 279 dwellings (164 townhomes Haverstraw, 96 multifamily + 19 townhomes Ramapo); 2009 SEIS 219 multifamily in Ramapo; 2020 traffic-study background figure 219 residential units
Status: Litigated - earlier approvals annulled; 2018 amended site plan agenda items, outcome unverified
Next step: Town of Ramapo Building, Planning and Zoning permit records / FOIL request for 33.06-1-1 and 33.06-1-2 - is there an active land-disturba…
View full project page →
Palisades Renewal Center (former IBM/HNA site)
In review — NOT approved
Palisades Renewal Center (former IBM/HNA site) is a housing project in Orangetown. Still being reviewed. Not approved yet.
Address: Former IBM/HNA Palisades Conference Center site, Tax Lot 78.13-1-1, Palisades area (abuts Palisades Interstate Parkway, NYS Route 340, US Route 9W)
Size: 342 townhouse-style units (modified proposal, June 2026; no more than 342), plus event venue / redesigned amenities center; hotel facility if circumstances warrant
Status: In review - NOT approved
Next step: Zone-change petition / SEQRA filing when submitted
View full project page →
155 South Greenbush Road Multifamily Community
In review — NOT approved
155 South Greenbush Road Multifamily Community is a housing project in Orangetown. Still being reviewed. Not approved yet.
Address: 155 South Greenbush Road, Orangeburg, Tax Lot 74.07-1-15.2 (petition also cites 74.07 in one agenda item - flagged, not smoothed)
Size: 180 dwellings derived (160 apartment units: 96 one-bed, 64 two-bed, ~172,000 sq ft across two buildings with roof decks + 20 townhouses: 2.5-story, 2-3 bed, ~2,400 sq ft each) + 8,000 sq ft clubhouse - concept plan, NOT approved
Status: In review - rezoning petition, NOT approved
Next step: Local-law adoption after Jan 2026
View full project page →
The Reserve at Pearl River
Approved — completed / built
The Reserve at Pearl River is a housing project in Orangetown. Built and finished.
Address: 555 Veterans Memorial Drive (also listed as 1000 Lucy Ct), Pearl River, Tax Lot 73.10-1-6, OP/PAC district
Size: 110 senior (55+) rental units
Status: Approved with conditions - site plan approved; completed / built 2025
Next step: None - completed
View full project page →
Tri Bee 2, Pearl River
In review — NOT approved
Tri Bee 2, Pearl River is a housing project in Orangetown. Still being reviewed. Not approved yet.
Address: 77 East Central Avenue + 80-84 East Washington Avenue, Pearl River, Tax Lots 68.16-6-13.1, 13.2, 13.3, 0.74 acres total
Size: 20 senior residential units + 5,000 sq ft commercial at street level (3-story mixed-use building; existing buildings to be demolished)
Status: In review - rezoning petition, NOT approved
Next step: PAC rezoning adoption after Dec 2025
View full project page →
West Haverstraw Commons (former Hoyer's ice cream stand)
In review — NOT approved
West Haverstraw Commons (former Hoyer's ice cream stand) is a housing project in West Haverstraw. Still being reviewed. Not approved yet.
Address: Southbound side of Route 9W just north of Railroad Avenue, West Haverstraw (former Hoyer's ice cream stand, 17-19 N. Route 9W - address from business record, NOT confirmed as the project parcel address in the news report - flagged)
Size: 82 townhouse-style condominiums (66 three-bedroom, 16 two-bedroom)
Status: In review - NOT approved
Next step: 9 Sept 2026 hearing outcome
View full project page →
80 South Broadway, Nyack
In review — NOT approved
80 South Broadway, Nyack is a housing project in Nyack. Still being reviewed. Not approved yet.
Address: 80 South Broadway, Nyack
Size: 18 residential units (4 studios, 12 one-bed, 2 two-bed) + 4 ground-floor retail spaces
Status: In review - NOT approved
Next step: Planning Board decision after May 2026 adjournment agendas
View full project page →
128 Main Street, Nyack
In review — NOT approved
128 Main Street, Nyack is a housing project in Nyack. Still being reviewed. Not approved yet.
Address: 128 Main Street, Nyack
Size: 10 one-bedroom apartments (ARB July 2024 minutes note the count was reduced to 8 at one point, with a 4th floor reduced to dormers - discrepancy flagged; agendas continue to say ten)
Status: In review - NOT approved
Next step: Planning Board site-plan decision after Oct 2025 adjournment agendas
View full project page →
Nyack smaller items roundup
Roundup — mixed
Nyack smaller items roundup is a group of smaller projects in Nyack. Still being reviewed. Not approved yet.
Address: 53 Burd Street; 32 South Franklin Street; 11 Fourth Avenue, Nyack
Size: Roundup - do not sum: 53 Burd 7-family conversion (2 one-bed, 5 two-bed); 32 S. Franklin rear addition adding 3-5 units to an existing 3-dwelling property (count changed across agendas: 5 in Mar 2026, 3 in June 2026 - flagged); 11 Fourth Ave demolish single-family dwelling, 2-lot subdivision, one new 2-family dwelling per lot (4 dwellings derived)
Status: Mixed - in review, NOT approved
Next step: Planning Board decisions for 53 Burd, 32 S. Franklin, 11 Fourth Ave
View full project page →
Orangetown scale-unverified items roundup
Roundup — mixed
Orangetown scale-unverified items roundup is a group of smaller projects in Orangetown. A mix of smaller projects. See the project page for each one.
Address: 283 North Middletown Road, Pearl River; 636 N. Greenbush Road, Blauvelt; Western Highway + Ellsworth Drive, Blauvelt; 80 South William Street, Pearl River; 175 NY-340, Sparkill; 622 Route 303, Blauvelt
Size: Scale unverified - NO unit counts for any item in this roundup
Status: Mixed - scale unverified, NOT counted
Next step: Planning Board minutes/packets giving scale for each item
View full project page →
Equestrian Estates Mixed Use Project / PUD
In review — NOT approved
Equestrian Estates Mixed Use Project / PUD is a housing project in Chestnut Ridge. Still in environmental review. Not approved yet.
Address: Red Schoolhouse Road (east side), north of Loescher Lane, Chestnut Ridge, Tax Lots 68.09-2-9, 10, 11, 12, 22 and 68.13-1-6
Size: 266 residential units total (FEIS, Nov 2022): 84 two-bedroom market-rate rental apartments over ~38,000 sq ft first-floor retail/commercial + 62 market-rate duplex townhouse units for sale + 118 senior housing rental units
Status: In EIS review - NOT approved
Next step: Village Board minutes post-Nov 2022: was the PUD floating zone adopted, and was site plan approved?
View full project page →
Rella Boulevard flex warehouse
Approved
Rella Boulevard flex warehouse is a warehouse project in Montebello. Approved.
Address: 300 Rella Boulevard, Montebello, Tax Map 55.08-1-6, LO-C zone, 18.5-acre commercial lot (NOT Town of Ramapo - jurisdiction trap corrected)
Size: Warehouse, not housing - 220,840 sq ft six-building flex warehouse + warehouse (reduced by 16,000 sq ft from an earlier version)
Status: APPROVED - site plan + special permit granted
Next step: Construction start
View full project page →
Crown Millwork warehouse
In review — NOT approved
Crown Millwork warehouse is a warehouse project in Montebello. Still being reviewed. Not approved yet.
Address: 31-33 North Airmont Road, Montebello, Tax Map 55.08-1-10 through 15, LO-C zone
Size: Warehouse, not housing - 108,000 sq ft warehouse with mezzanine office space (subdivision / lot-line disclaimer + site plan)
Status: In review - NOT approved
Next step: Planning Board meeting after July 2026 continuation
View full project page →
5 Hemion Road office building
Approved
5 Hemion Road office building is an office project in Montebello. Approved.
Address: 5 Hemion Road, Montebello, Tax Map 55.10-1-5.2, NS zone, 1.57 acres
Size: Office, not housing - 16,352 sq ft two-story office building with parking underneath and outside
Status: APPROVED - site plan re-approved
Next step: Condition compliance
View full project page →
Yeshiva Ohr Reuven - temporary classroom trailer
In review — NOT approved
Yeshiva Ohr Reuven - temporary classroom trailer is a school project in Wesley Hills. Still being reviewed. Not approved yet.
Address: 251-259 Grandview Avenue, Wesley Hills, Ramapo Tax Parcels 40.16-1-17 and 18, R-50
Size: School, not housing - manufactured trailer with two classrooms and two bathrooms for additional elementary-age students for the 2026-2027 school year, temporary solution while the site is evaluated for a permanent addition
Status: In review - NOT approved
Next step: Planning Board decision after Aug 2026 agenda
View full project page →
Village Green Shul
In review — NOT approved
Village Green Shul is a house of worship project in Wesley Hills. Still being reviewed. Not approved yet.
Address: 4 Village Green, Wesley Hills, Ramapo Tax Parcels 41.11-2-17 and 18, R-35 (Monsey mailing address - jurisdiction trap: tax parcels and board hearing are Wesley Hills)
Size: House of worship / gathering, not housing - special permit and site plan for a neighborhood gathering use: existing building plus proposed addition of multi-use religious gathering spaces and a single-family residence; existing single-family residence leased to a not-for-profit providing free housing to families of patients at a local hospital/treatment facility
Status: In review - NOT approved
Next step: Planning Board decision after Aug 2026 agenda
View full project page →
Suffern WA multifamily - 37 Washington Avenue
In review — NOT approved
Suffern WA multifamily - 37 Washington Avenue is a housing project in Suffern. Still being reviewed. Not approved yet.
Address: 37 Washington Avenue, Suffern, 1.865 acres, frontage on Washington Avenue and Suffern Place, north of the Community Center and Masjid Darul Ehsan Mosque and School; former Avon Nail Enamel building site
Size: 121 dwelling units (mix of 1-, 2-, and 3-bedroom) in a five-story multifamily building with parking garage, recreation area, swimming pool, and club room
Status: In review - NOT approved (Conditioned Negative Declaration only)
Next step: Board of Trustees TDD rezoning decision
View full project page →
Sloatsburg MU-1 / Stewart Farm / Rabinovitz roundup
Roundup — mixed
Sloatsburg MU-1 / Stewart Farm / Rabinovitz roundup is a group of smaller projects in Sloatsburg. Still being reviewed. Not approved yet.
Address: 225, 227, 229, 235 Orange Turnpike (Stewart Farm site); 258 Orange Turnpike (Rabinovitz); 240-244 Orange Turnpike (MU-1 extension request), Sloatsburg
Size: Roundup - do not sum: Stewart Farm multifamily development, unit count NOT stated in minutes checked; Rabinovitz 258 Orange Turnpike: 7-unit apartment building proposed, current density allows only 3.91 units for the lot size, existing building has 5 grandfathered units; 240-244 Orange Turnpike (R-10, only a small portion in MU-1): request to extend MU-1 district to cover the whole area
Status: In review - NOT approved; MU-1 zoning change itself NOT approved
Next step: MU-1 adoption after Sept 2026 hearing left open
View full project page →
Former Viznitz yeshiva site, Kaser
Unofficial plans only — NOT approved
Former Viznitz yeshiva site, Kaser is a development project in Kaser. Only unofficial plans exist. Not approved.
Address: 2.7-acre property formerly owned by the Viznitz yeshiva, Village of Kaser (street address not stated in sources checked)
Size: No unit count - three four-story residential buildings shown in easement only: two around 53,000 sq ft and one around 46,000 sq ft; do NOT list unit counts for this site
Status: NOT approved - unofficial plans only
Next step: Village Board action after May 2026 easement filing
View full project page →
Vitz / Bais Yehuda school building
In review — NOT approved
Vitz / Bais Yehuda school building is a school project in New Hempstead. Still being reviewed. Not approved yet.
Address: 710 Union Road, New Hempstead, Ramapo Tax Map 42.17-1-95, 1R-40 (special use permit for school already granted)
Size: School, not housing - standalone 11,830 sq ft two-story school building, as an addition to the existing two-story school building
Status: In review - NOT approved
Next step: Planning Board decision after Feb 2025 lead-agency intent
View full project page →
Concord Capital downtown transit-oriented development (proposal)
Proposal only — status unverified
Concord Capital downtown transit-oriented development (proposal) is an office project in Spring Valley. Only a proposal so far. Not approved.
Address: Downtown urban renewal zone, near the Spring Valley train station, Spring Valley (sites described: Main Street / Lawrence Street / station; Municipal Plaza / Main Street / West Furman Place; Franklin Street / Municipal Plaza / station)
Size: Proposal only - up to 1,000,000 sq ft of as-of-right development (residential multifamily, retail, office, new park space) - NO unit count stated; commuter parking garage (MTA lot expanded to 1,000 new spaces plus 236 existing) and upgraded train station
Status: Proposal only - status unverified, NOT approved
Next step: Current status of the Concord Capital TOD proposal
View full project page →
New City Living
In review — NOT approved
New City Living is a housing project in Clarkstown. Still being reviewed. Not approved yet.
Address: 180-248 and 254-258 South Main Street, New City, Tax Parcels 51.07-1-10 and 51.07-1-11, 11.972 acres, H4 zoning, east side of Main Street ~220 ft south of Third Street
Size: 152 multifamily units
Status: In review - NOT approved
Next step: Planning Board decision after July 15, 2026 preliminary hearing
View full project page →
Cedar Corners warehouse
In review — NOT approved
Cedar Corners warehouse is a warehouse project in Clarkstown. Still being reviewed. Not approved yet.
Address: West side of NYS Route 303, Congers (County files it at 299 North Route 303), Tax Lots 35.19-2-6, 8, 9, 10, 12-20, 44.07-2-10, 10.01 and 10.02
Size: Warehouse, not housing - 561,520 sq ft warehouse/office total (Lot 1: 380,780 sq ft, 394 parking, 72 loading berths; Lot 2: 1,500 sq ft fast-food drive-thru, 34 parking; Lot 3: 180,740 sq ft, 199 parking, ~2.5-acre conservation easement)
Status: In review - NOT approved
Next step: Planning Board decision after July 2026 Supplemental DEIS hearing
View full project page →
749-755 Route 9W Multi-Family Development
In review — NOT approved
749-755 Route 9W Multi-Family Development is a housing project in Clarkstown. Still being reviewed. Not approved yet.
Address: East side of Route 9W, Valley Cottage, Tax Parcels 53.13-2-28 and 53.13-2-29, MF-1 zoning (1.09 acres per campaign version; ~1.2 acres per 2024-10-30 narrative - flagged)
Size: 5 NEW multifamily units + existing single-family house retained + 400 sq ft community hall = 6 units total on site (CORRECTED - not 6 new units as the campaign compilation states it)
Status: In review - NOT approved
Next step: ZBA Appeal 4408 record
View full project page →
Stony Point Letchworth Village property (former Letchworth Village Developmental Center / Patriot Hills)
Rejected — NOT active
Stony Point Letchworth Village property (former Letchworth Village Developmental Center / Patriot Hills) is a housing project in Stony Point. Voters turned it down. It is not going ahead.
Address: 100 N. Charles Street, Stony Point (former Letchworth Village Developmental Center / Patriot Hills)
Size: Proposed ~500 units (2022 program) - NOT active, NOT counted as pipeline: 150 apartments/townhouses for seniors, 170 assisted-living rooms, ~180 other units including rentals; Oct 2022 town presentation program table totals 100 townhouses (55+) + 50 condo flats (55+) + 125 multifamily + 170 assisted/independent = 445, not 500 - internal discrepancy, do not smooth
Status: REJECTED by voters - NOT approved, NOT active
Next step: Any new proposal for the town-owned site (none active as of first pass)
View full project page →
Eagle Bay (Breakers Stony Point)
Approval claimed — NOT verified
Eagle Bay (Breakers Stony Point) is a housing project in Stony Point. An approval is claimed, but the board record for it has not been found yet.
Address: 22, 29, 31, 36 Hudson Drive, Stony Point (former Stony Point Marina and Yacht Club, south of Stony Point Battlefield), Tax Lot 15.04-6-3 (plus 15.04-6-4 and 6 in the 2025 agenda)
Size: 268 multifamily mixed-use units in four buildings per FEIS (2020 coverage says 264 units - discrepancy, do not smooth) + ~13,500 sq ft commercial on the south end (2020 coverage says 12,000 sq ft - flagged)
Status: Site-plan approval claimed via 2025 extension request; approval date and vote UNVERIFIED; construction NOT confirmed - NOT counted as approved
Next step: Stony Point Planning Board minutes index: Eagle Bay site-plan approval resolution (date + vote) and any construction-start evidence
View full project page →
Grassy Point Bend warehouse
In review — NOT approved
Grassy Point Bend warehouse is a warehouse project in West Haverstraw. Still in environmental review. Not approved yet.
Address: East Railroad Avenue and Beach Road, Village of West Haverstraw
Size: Warehouse, not housing - 454,000+/- sq ft warehouse facility with accessory office space, truck loading docks, trailer storage spaces (0 homes - not in housing counts)
Status: In EIS review - NOT approved
Next step: West Haverstraw Planning Board minutes for the 2026-08-12 DEIS hearing outcome
View full project page →